Back to TIGER Integration at NSBF

Reparing lemo cables and
a photomultiplier tube


Lauren and Georgia
checking the instrument
Garry begins LEMO
repair training
Garry and Steve
practice making cables
Steve pulls back
some insulation

Garry works on
a cable
Dana cuts heat shrink
for a LEMO cable
Dana begins separating
the detectors
A view outside from
inside the PIG barn

Garry repairs and
Lauren inspects
The crew works on
the top module
From another angle
Lauren and Georgia
inspecting cables

Erich checks in with the
TIGER group
Garry continues to work
Georgia inspects
Installing repaired cables
underneath and around

Garry inspects the new
Cherenkov PMT
Old LEMO connectors

TIGER NSBF Integration Pictures
Repairing LEMOs | TIGER in the gondola | ARIA | ANITA | Ferrites and EMI
SIP Installation | Compatibility Test | Hangtest | NSBF and Palestine | Other pictures