Back to TIGER Integration at NSBF

Installing ferrites,
the TIGER-monitor antenna
and the EMI shield


Ferrites installed around
the relay panel
Cables going up
to the relay board
PHA vicor module
PHA vicor module

Cables going into
the PC-104 stack

Dana and Garry install
the EMI shield
John and Dana put on a
panel of the EMI shield

TIGER in its EMI shield
Access to the B corner
Antenna to monitor
emission from TIGER
The back of the antenna
covered in EMI foam

TIGER NSBF Integration Pictures
Repairing LEMOs | TIGER in the gondola | ARIA | ANITA | Ferrites and EMI
SIP Installation | Compatibility Test | Hangtest | NSBF and Palestine | Other pictures