Back to TIGER Integration at NSBF

Dropping TIGER into the gondola


Bringing in the gondola
The gondola before
TIGER is installed
Discussing the orientation
in the gondola
Beginning the lift

Securing the gondola
Lifting TIGER into
the gondola
TIGER approaches
TIGER from underneath

Dropping it in
John watching as TIGER
is lowered
Bringing it in...
...with care

Support structure...
...before it is bolted in
TIGER in the gondola
with a light baffle on

TIGER NSBF Integration Pictures
Repairing LEMOs | TIGER in the gondola | ARIA | ANITA | Ferrites and EMI
SIP Installation | Compatibility Test | Hangtest | NSBF and Palestine | Other pictures